The 976km Tema-Mpakadan Standard Railway line and the Diesel Multiple Unit (DMUs) trains are going to be inaugurated the 21st November, 2024.
The train will operate from Tema to Juapong passing through the iconic 300m long railway bridge on VOLTA RIVER with stops at the following stations. Tema Harbor, Tema Industrial Area, Ashaiman, Afienya, Shai Hills, Doryumu, Kpong, and Juapong.
The 976km Tema-Mpakadan Standard Railway line and the Diesel Multiple Unit (DMUs) trains are going to be inaugurated the 21st November, 2024. The train will operate from Tema to Juapong passing through the iconic 300m long railway bridge on VOLTA RIVER with stops at the following stations. Tema Harbor, Tema Industrial Area, Ashaiman, Afienya, Shai Hills, Doryumu, Kpong, and Juapong.
Like
Love
6
0 Comments 0 Shares 198 Views 0 Reviews
Sponsored
Sponsored